2015-09-07

Man cave: Day 5

I can has walls! Well, I have insulation on all walls and plasterboard on two (with sockets cut out). Should have the last of plaster board in morning and then the work on the floor - which needs insulating and levelling.

Cameras are up, external security lights are up, new lighting wiring all done, and I have the new fused spurs for the battery boxes for the alarm system and doors. I have a new small 19" rank in the loft with new power sockets, so I can make that all a lot tidier.

It definitely does not look like a garage now, and should look way more impressive by end of tomorrow. Plumber coming in tomorrow to sort where the sink is going. Bricks expected Wednesday so we can start getting an actual wall at the front.